Client: Kilwex Civil Engineering

Project: Dublin Port Internal Roads, Cycle & Pedestrian Network

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: The project comprises demolition of redundant buildings, site clearance, bored and sheet piling, construction of fencing and boundary walls, drainage and other services, earthworks, new and upgraded road construction (circa 50,000m2), laying of kerbs, foot-ways and cycleways, gantry and underpass construction, public lighting, traffic signals and landscaping. 

Client: John Sisk & Son

Project: Coopers Cross, Dublin – Construction of over 390,000 sq ft of Grade A office space across two buildings with up to six stories above ground level.

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: Construction of over 390,000 sq ft of Grade A office space across two buildings with basement, lower ground and up to six stories above ground level.

 

 

 

 

Client: Apex Surveys

Project: Site investigations to provide information to the Preliminary Design and Environmental Impact Assessment for the MetroLink project.

Services Provided: Traffic Management Plans, TM Crews, Impact Protection Vehicles

Description: Apex Surveys have been appointed by TII to carry out site investigations in order to provide information in respect of existing underground utilities (services) to inform the Preliminary Design and Environmental Impact Assessment for the MetroLink project. The works will take place on M50 Northbound & Southbound between Junction 3 & Junction 5, R108 Ballymun & R132 Swords.

Client: PJ Hegarty & Sons

Project: ESB Head Office, Dublin – construction of new, near zero energy, 45,000 sqm offices

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: Redevelopment and construction of new, near zero energy, 45,000 sqm offices in the heart of Dublin City Centre. The Project will involve the retention and refurbishment of a number of protected Georgian structures and the construction of the two new seven storey office blocks.

Client: Energoinvest Reachactive

Project: Installation of 220kv ducting including Joint Bays to facilitate cable installation by ESB.

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: Installation of 220kv ducting including Joint Bays to facilitate cable installation by ESB.

Client: Walls Construction

Project: Cork Street Student Residences, Dublin – Construction of 399 bedrooms and associated common areas

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: Construction of 399 bedrooms and associated common areas

Client: John Sisk & Son

Project: 1 Wilton Park, Dublin –  Construction of 4 new buildings compromising of  600,000 sq ft

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: Demolition of the existing 1960s building and the construction of 600,000 square ft office and retail development comprising four new buildings.

.

Client: John Craddock Ltd.

Project: Navan Town Scheme, 2030 Contract 1 – urban regeneration of Railway Street and Abbey Road.

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: The project is the first phase of the Navan 2030 Town Scheme. The project consists of the urban regeneration of Railway Street and Abbey Road along with the reticulation of new water mains, broadband and traffic infrastructure.

.

Client: DM Morris Ltd.

Project: Belgard Square North – Cookstown Ind. Estate Link Road – Extension of the existing Cookstown Road to connect with Belgard Square North.

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: Extension of the existing Cookstown Road, provision of a new footpath/cycle track, provision of new public lighting, signage, street furniture, associated drainage for the route.

Client: DM Morris Ltd.

Project: Monastery Road Improvement, Dublin

Services Provided: Traffic Management Plans, TM Crews, Impact Protection Vehicles

Description: Construction of new Wide footpath, Installation of several pedestrian crossing facilities, tree planting and resurfacing of the footpath and cycle track.

Client: Northlink M1 Ltd.

Project: M1 Junction 10 Barrierguard Installation to provide safe working area for ESB works.

Services Provided: Barrierguard Installation Crew, Equipment Rental, Transport & Lifting of Barrier.

Description: Northlink M1 Limited were tasked with providing a safe working area to facilitate ESB works taking place in the hard shoulders of the on/off slips.

Client: Roadstone

Project: Resurfacing of various major carriageways throughout South Dublin City.

Services Provided: Traffic Management Plans, TM Crews, Equipment Rental

Description: Resurfacing of various major carriageways throughout South Dublin City.